Vice President for Export, Sales and Management of the Materials Transmission Network Vladimir Chaus, during an informational meeting with the collective, presented the results of work over the past 9 months, gp.by reported to the company's press service.
From January to September, more than 1.1 million tons of steel were produced at BMZ, over 1 million tons of rolled product, more than 105 thousand tons of hardware products and over 58 thousand tons of pipes. The plant continues to fulfill all social obligations, and wages are paid on time.
The enterprise operated efficiently in the second quarter. Thanks to its timely response to positive changes in the Russian market, the plant achieved positive profitability. The most relevant tasks for top management today remain market diversification, logistics and related raw material supply, as well as timely shipment of products.
From November 1, two electric steel furnaces will be shut down for capital repair. The collective faces the task of conducting this operation promptly and of high quality.
«In the difficult conditions of the global metal products market, we are diligently using time to prepare the equipment for increased production volumes», — noted Vladimir Chaus.