18 Nov 2026 | 23:03

KGC returned 68 thousand rubles to the budget.

image

Specialists of the State Control Committee (SCC) of the Gomel Region have uncovered facts of excessive expenditures allocated for the repair of six streets in Kalinkovichi and the agritown of Syrod, Kalinkovichi District. The inflated costs were identified during an analysis of the estimation documentation.

It was revealed that the contracting organization included a number of actually uncurred costs in the calculation for the production of asphalt concrete mixtures for the repair of these streets. As a result, the cost of asphalt concrete in the local estimates turned out to be inflated by more than 15%.

In addition, in the estimates and acceptance certificates for the repair of Sovetskaya Street in Kalinkovichi, the contractor included inflated volumes of the asphalt concrete mixture for the road surface, illegally receiving over 60 thousand rubles.

At the demand of the SCC, the estimates were adjusted by the customer. By eliminating unjustified expenses, the cost of repairs was reduced by 408 thousand rubles without compromising quality. 68 thousand rubles have been returned to the budget.

Join our Newsletter